Case Studies > Piled New Foundations

Piled New Foundations

Our complex piled raft construction gets NHBC approval

Purkelly designed and installed a piled raft solution in a restricted access development of 5 mews houses carrying the NHBC guarantee.

Client: A local developer

Piled raft solution wins on practicality and cost

Purkelly provided the design and built the piled raft solution for a timber framed residential and office development.

Client: The architects occupying the property

Purkelly is resourced for projects throughout the South East

Although North London based, Purkelly is resourced to carry out piling and underpinning work throughout the South East. This project was at a site near Guilford in Surrey.

Client: Building contractor for an insurance funded project

Accurate advice for the consulting engineer

From information provided on ground conditions, Purkelly were able to produce pile design calculations to satisfy the engineer's specified loadings.

Client: The main contractor

Piling proves the economical solution

A new foundation piled raft provided an economical alternative to deep trench foundations for this extension to a semi detached property.

Client: The property owner/occupier