Existing foundations were inadequate to support the upward extension of a substantial 200 sq metre house involving a completely new storey.
Client: The architect acting for the owners
Case Studies > Piled Underpinning
Existing foundations were inadequate to support the upward extension of a substantial 200 sq metre house involving a completely new storey.
Client: The architect acting for the owners
Unexpected ground conditions call for rapid problem solving.
Client: The consulting engineers
Purkelly used 12m steel cased piles driven by vibratory hammer when soft silty gravelly clay was encountered to a considerable depth.
Client: Main Contractor via Structural Engineer
Purkelly were quick to solve the problem when a 3m test bore filled up and collapsed.
Client: A local building contractor
Purkelly provided a full range of services including piled underpinning, reinstatement and superstructure repairs for this contract to an extension at a large detached house. The emphasis was on quality throughout.
Client: The consulting engineer