Our minor design changes resulted in significant savings and ensured the underpinning was completed within the time allowed.
Client: A local building contractor
Case Studies > Traditional Underpinning
Our minor design changes resulted in significant savings and ensured the underpinning was completed within the time allowed.
Client: A local building contractor
The environmental rewards were fewer vehicle movements, less spoil and materials.
Client: Building insurers through their consulting engineer
We cooperated very closely with the builder, working to strict schedules so that tenants could continue their business normal.
Client: Business property developer
A little care goes a long way in a client's garden
Client: The property owner / occupier
Purkelly were asked to design an economical scheme for traditional underpinning and anti-heave measures.
Client: The main contractor
All parties to the contract agreed that the contract had a successful outcome and was achieved with the minimum of disruption.
Client: Local authority technical services department
By using two sets of temporary shoring, our team was able to work continuously and efficiently to complete the contract.
Client: Building Insurers via their consulting engineer